Construction Services
- Fiber Optics Splicing Services
- Fiber Optics Testing Services
- Documentation and Labeling Services
- Fiber Optics Emergency Restoration Services
- Maintenance Services
- ISP/OSP Construction Services
- Directional Boring/Trenching
- Inner-duct and Cable Pulling Installation
- Manhole/Handhole Installation or Replacement
Project Management
- Planning and Tracking Reports
- Schedule and Budget Management
- Material Management
Engineering Services
- Engineering Feasibility Studies
- Outside/Inside Plant Engineering
- Consulting
- As-Built Documentation
OSP Construction
ISP Construction
Splicing
- All Cable & Enclosure Types and Filters
- Single and Mass Fusion Splicing
- Field Connectorization
- Mechanical Splices
- Inside and Outside Plant
- All Types of Fiber (including OPGW)
- Aerial and “Hot Cut” Splicing also available
Testing
- Pre-placement Reel Testing
- Post-placement Span Testing
- Final Testing
- OTDR
- Insertion Loss Testing (power meter)
- Optical Return Loss
- Testing of Existing Routes also available
Documentation
- OTDR Signatures of Fiber
- Bi-directional Splice Loss Tables with Span Averages
- Optical Loss Tables
- GPS Coordinates of Splice Points
- Distance Between Splice Points
- All Available on Hard and Soft Copies
Refurbish Existing Routes
- Maintain Live Traffic by Installing Temporary Cable (as required)
- Roll Traffic Utilizing “Hot Cut” Method
- Replace/Repair Faulty Cable
- Roll Traffic Back by “Hot Cut”
Field Personnel
- Full time employees for splicing and installation services to support Day and Night Shifts
EQUIPMENT
Major Equipment
- Fujikura FSM 70S splicers
- Fujikura FSM 70R ribbon splicers
- Laser Precision/ GN Nettest/ Anritsu OTDRs
- All necessary tools for working on any type of Fiber Optic cable including Fiber Optics Identifiers
- Vehicles used for field splicing including Splicing Lab Trailers. All vehicles are equipped with generators, lights for night work and applicable safety equipment
- Mini-Excavator
- Cable Pulling Machines & Air Compressors
- Additional equipment utilized as needed
Safety Equipment
- Manhole Safe Package Kit
- Confined Space Rescue System
- Gas meter detector
- Air blower
- Full body harness and lanyard
- Manhole Safety Cone Bars
- Personal Protection Equipment (PPE)
- High Voltage Gloves
- Volt Meter
- Grounding Cables
ACCOMPLISHMENTS
Florida Power & Light (FPL)
- 17+ years of service
- Company with longest partnership for splicing services
- 10,000+ jobs completed
Walt Disney World
- Smart City Project
- Fiber optic connectivity amongst all Disney Parks & Resorts
Allied Fiber
- 1 Terabit Super-Channel
- Transmission spans 1,700 km through fiber optic ring connecting West Palm Beach to Jacksonville (All Aboard/FEC Railroad)
World Fiber Technologies, Inc.
- Intelligent Transportation Systems Plans
- Palm Beach and Broward County